17.85 km
2 cut & cover and 11 NATM tunnel
Within the project there are 17.85 km main line, 2 cut & cover and 11 NATM tunnel type stations. There is a fully automatic underground parking system at the City Hospital Station. The design speed is 90 km/h.
This line is the continuation of Uskudar-Umraniye- Cekmekoy, which is Türkiye's first driverless metro line.
The metro has “Driverless Subway and Signaling System” and “Full Height Platform Separator Door (PAKS) System”.
Within the project there are 17.85 km main line, 2 cut & cover and 11 NATM tunnel type stations. There is a fully automatic underground parking system at the City Hospital Station. The design speed is 90 km/h.
This line is the continuation of Uskudar-Umraniye- Cekmekoy, which is Türkiye's first driverless metro line.
The metro has “Driverless Subway and Signaling System” and “Full Height Platform Separator Door (PAKS) System”.