220,000 m³/ day capacity
The project is being implemented by ILBANK through World Bank grants and loans.
Phase 2 Facility increases the capacity of the existing facility from 110,000 m³/day to 220,000 m³/ day and develop the process with a thermal sludge drying unit.
Project services consist of design review, preparation of bidding documents and construction supervision services.