3610 m
Cross sectional area: 55 m²
It is a double tube highway tunnel constructed by New Austrian Tunneling Method (NATM). Nemila Tunnel is included in the Poprikise-Nemila Motorway Project.
Cross sectional area of the tunnel is 55 m². The minimum excavation area is 101 m².
The total length of the tunnel is 3610 m.
It is a double tube highway tunnel constructed by New Austrian Tunneling Method (NATM). Nemila Tunnel is included in the Poprikise-Nemila Motorway Project.
Cross sectional area of the tunnel is 55 m². The minimum excavation area is 101 m².
The total length of the tunnel is 3610 m.