2016-ONGOING, ARTVIN, TURKIYE

Tunnels within the scope of the Yusufeli Connection Roads

The 67 km long highway project tendered in 3 packets for the provision of the connection roads to Yusufeli Dam and
Hydroelectric power plant contains 41 tunnels of 56.7 km length, 17 bridges and a large number of smaller outdoor structures.

Access to Turkey’s highest dam

Overview
Project Summary

41 tunnels with a total length of 56.7 km

Services
Location
Artvin, Turkiye
Period
2016- Ongoing
Employer/Client
Limak Inşaat /General Directorate of Highways

Write down the word you are searching for and press "ENTER".
Press "ESC" to close.