110,4 km
Design speed: 120 km/s
9 stations
The Horadiz-Agbend railway line, with a gauge of 1520 mm, is 110.4 kilometers long and has a design speed of 120 km/h.
The project, which includes 9 stations, features the construction of 2 railway tunnels in the Agbend region, marking Azerbaijan's first railway tunnels.
Passing through the geopolitically significant Zangezur Corridor, the project aims to connect Western Asia with Eastern Europe, serving both passenger and freight transportation of great importance. By connecting the Nakhchivan Autonomous Republic, an integral part of Azerbaijan, via railway, strategic, economic, and political objectives will be achieved.
The Horadiz-Agbend railway line, with a gauge of 1520 mm, is 110.4 kilometers long and has a design speed of 120 km/h.
The project, which includes 9 stations, features the construction of 2 railway tunnels in the Agbend region, marking Azerbaijan's first railway tunnels.
Passing through the geopolitically significant Zangezur Corridor, the project aims to connect Western Asia with Eastern Europe, serving both passenger and freight transportation of great importance. By connecting the Nakhchivan Autonomous Republic, an integral part of Azerbaijan, via railway, strategic, economic, and political objectives will be achieved.