Total Length: 50,7 km
Total Number of Stations: 83
The work covers Setif, Mostaganem and Sidi Bel Abbes Tramways. The total length of these 3 Projects is 50,7 km, the number of the stations 83.
The scope of work for the Setif and Mostaganem tramway consists of engineering, design and construction supervision services, and for the Sidi Bel Abbes Tramway of engineering and design services.
The construction of the 22.4 km long double track Setif Tramway was completed in 2018 and the line was commissioned. The engineering and design work for the Sidi Bel Abbes Tramway was completed in 2020.
Our construction supervision work on the Mostaganem Tramway which is the latest tramway system under construction in Algeria, continues. The trial run of this 14.2 km long tramway with it’s 24 stations, 1 viaduct, 3 cut-cover tunnel, took place during the last days of 2020.
The work covers Setif, Mostaganem and Sidi Bel Abbes Tramways. The total length of these 3 Projects is 50,7 km, the number of the stations 83.
The scope of work for the Setif and Mostaganem tramway consists of engineering, design and construction supervision services, and for the Sidi Bel Abbes Tramway of engineering and design services.
The construction of the 22.4 km long double track Setif Tramway was completed in 2018 and the line was commissioned. The engineering and design work for the Sidi Bel Abbes Tramway was completed in 2020.
Our construction supervision work on the Mostaganem Tramway which is the latest tramway system under construction in Algeria, continues. The trial run of this 14.2 km long tramway with it’s 24 stations, 1 viaduct, 3 cut-cover tunnel, took place during the last days of 2020.