2x2 NATM Tunnel
7110 m
Cross sectional area: 64.71 m
It is a double tube highway tunnel (2x2) constructed by New Austrian Tunneling Method (NATM). Cross sectional area of the tunnel is 64.71 m², the minimum excavation area is 114 m². The total length of the tunnel is 7110 m.
Kirik-Ispir Tunnel Crossing is important point having much traffic congestion because of the severe winter conditions.
When the project is completed, Kirik Tunnel provides saving time about an hour and because the road will be 33 km shorter than the old version. It also provides safety & comfortable transportation opportunity for drivers.
It is a double tube highway tunnel (2x2) constructed by New Austrian Tunneling Method (NATM). Cross sectional area of the tunnel is 64.71 m², the minimum excavation area is 114 m². The total length of the tunnel is 7110 m.
Kirik-Ispir Tunnel Crossing is important point having much traffic congestion because of the severe winter conditions.
When the project is completed, Kirik Tunnel provides saving time about an hour and because the road will be 33 km shorter than the old version. It also provides safety & comfortable transportation opportunity for drivers.