2011 - 2015, ERZURUM, TURKEY

Kirik-Ispir Road Tunnel

It is a double tube highway tunnel (2x2) constructed by New Austrian Tunneling Method (NATM). Cross sectional area of the tunnel is 64.71 m², the minimum excavation area is 114 m².

Overview
Project Summary

2x2 NATM Tunnel

7110 m

Cross sectional area: 64.71 m

Services
Location
Turkey
Period
2011-2015
Employer/Client
General Directorate of Highways

Write down the word you are searching for and press "ENTER".
Press "ESC" to close.