A 4 km extension to the existing metro line
3 specially designed stations
The project consists of the construction of a 4 km long extension to the existing 7.82 km long metro line in the city of Dnipropetrovsk with it’s 6 stations, 3 of which come under the scope.
Included are 3 deep bored tunnel stations (Theatre station, Central Station and Historical Museum Station) and a 4 km deep tunnel structure.
It also covers the design of the stations, connections to the existing metro line and stations, and the design of electro-mechanical systems.