16,5 km
26 station
The 16.5 km long light rail system consists of two intersecting alignments. The first of these is the 9.7 km long alignment between the SSK Hospital - Central Bus Station; and the second one the 6.8 km long alignment between Osmangazi University - Center- Kuyubasi.
The alignments under the project house 26 stations, 60.000 m2 depot area, a maintenance workshop with 5000 m2 indoor space, management building with 1600 m2 indoor space, 2.92 km depot area, 6 transformer and other structures, the signalling, telecommunication and command centre.
The 16.5 km long light rail system consists of two intersecting alignments. The first of these is the 9.7 km long alignment between the SSK Hospital - Central Bus Station; and the second one the 6.8 km long alignment between Osmangazi University - Center- Kuyubasi.
The alignments under the project house 26 stations, 60.000 m2 depot area, a maintenance workshop with 5000 m2 indoor space, management building with 1600 m2 indoor space, 2.92 km depot area, 6 transformer and other structures, the signalling, telecommunication and command centre.