70 km
13 stations
6 transfer points
The project consists of a 70 km line connecting Gayrettepe-Istanbul Airport-Halkali with 13 underground stations, 18 service stations, 1 depot and maintenance area. The project's design speed is 120 km/h, and it reduces the travel time between Gayrettepe and the Istanbul Airport to 30 minutes.
Istanbul Airport Rail System integrates with the metro lines of Istanbul in 6 transfer points, including connection to Marmaray and the other railway lines.