7 projects
Total length 85 km
The Izmir Light Rail System consists of the Konak Tramway, Buca and Karşıyaka Tramway, Izmir Bay Crossing Rail System Lines, Cigli Tramway, Ornekkoy-Yenigirne Tramway as well as Bayraklı-City Hospital Cable Car Line, the system of which is called a rope system.
The total length of the 7 projects is 85 km; it contains 111 stations.
Construction supervision services within the scope of Izmir Light Rail System Project, design services for Konak, Buca and Karsiyaka Tramway Projects were provided. In the Izmir Bay Crossing Project, design services were provided and tender documents were prepared.
The Cigli Tram Line, the contract of which was signed in 2021, includes the tramway line and its stops, transformer buildings (above and below ground), viaduct construction, engineering structures, line superstructure and landscaping, and the extension of platform lengths of the Konak tramway stops. The total length of the project is 12 km; it contains 14 stations.
Another project, the contract of which was signed in 2021, is the Bayrakli-City Hospital Cable Car Line. Further to transport studies and alignment studies and following efficiency analyses a single rope system was preferred. The line is 2.65 km long and contains 4 stations.
The Izmir Light Rail System consists of the Konak Tramway, Buca and Karşıyaka Tramway, Izmir Bay Crossing Rail System Lines, Cigli Tramway, Ornekkoy-Yenigirne Tramway as well as Bayraklı-City Hospital Cable Car Line, the system of which is called a rope system.
The total length of the 7 projects is 85 km; it contains 111 stations.
Construction supervision services within the scope of Izmir Light Rail System Project, design services for Konak, Buca and Karsiyaka Tramway Projects were provided. In the Izmir Bay Crossing Project, design services were provided and tender documents were prepared.
The Cigli Tram Line, the contract of which was signed in 2021, includes the tramway line and its stops, transformer buildings (above and below ground), viaduct construction, engineering structures, line superstructure and landscaping, and the extension of platform lengths of the Konak tramway stops. The total length of the project is 12 km; it contains 14 stations.
Another project, the contract of which was signed in 2021, is the Bayrakli-City Hospital Cable Car Line. Further to transport studies and alignment studies and following efficiency analyses a single rope system was preferred. The line is 2.65 km long and contains 4 stations.