2020-ONGOING, CROATIA

Krizevci-Koprivnica Railway

42 km long double track, standard gauge dublication and rehabilitation project and consists of detailing the main design. The design speed is 160 km/h.

Rehabilitation of the most important railway network of Croatia

Overview
Project Summary

42 km railway

Double track, standard gauge dublication and rehabilitation project

Design speed is 160 km/h

Services
Location
Croatia
Period
2020 - Ongoing
Employer/Client
Cengiz İnşaat Sanayi ve Ticaret A.Ş. / HŽ Infrastruktura – Croatia Railways