6.5 km
6 stations
Twin TBM Tunnel
As part of the extension of the existing Bucharest metro network to the Henri Coanda International Airport, the project includes between the stations 1 Mai and Tokyo.
The project consists of enginering and design services of structural works for 6.5 km long twin TBM tunnel metro line.
There are 6 underground stations, 5 ventilation shafts, 2 separate drainage shafts and “1 Mai station” connection structures within the scope of the project.
As part of the extension of the existing Bucharest metro network to the Henri Coanda International Airport, the project includes between the stations 1 Mai and Tokyo.
The project consists of enginering and design services of structural works for 6.5 km long twin TBM tunnel metro line.
There are 6 underground stations, 5 ventilation shafts, 2 separate drainage shafts and “1 Mai station” connection structures within the scope of the project.