Rehabilitation of a 329 km long railway line
Single track, metric gauge railway
Design speed is 90 km/h
Rehabilitation project of 329 km long single track, metric gauge railway between Yaoundé and Ngaoundéré.
The design speed is 90 km/h. There are 9 stations and 33 bridges within the scope of the project.
The main goal of the project is to increase the design speed from 60 km/h to 90km/h for passenger traffic and make necessary design studies for the rehabilitation of the structures and stations.
Rehabilitation project of 329 km long single track, metric gauge railway between Yaoundé and Ngaoundéré.
The design speed is 90 km/h. There are 9 stations and 33 bridges within the scope of the project.
The main goal of the project is to increase the design speed from 60 km/h to 90km/h for passenger traffic and make necessary design studies for the rehabilitation of the structures and stations.