2012-2017, IZMIR, TURKEY

Izmir Bay Crossing Bridge

The superstructure of the 3585 m-long approach bridge has a post-tensioned box-section deck, the superstructure of the 590-meter-long main bridge has a tensioned inclined cable-suspended deck. 

4 km long bridge within the scope of the Izmir Bay Crossing project

Overview
Project Summary

Approach bridge: 3585 m long sea bridge

Main bridge: 590 m long cable-stayed suspension sea bridge

Total: 4175 m

Services
Location
Izmir, Turkey
Period
2012 - 2017
Employer/Client
Highways General Directorate

Write down the word you are searching for and press "ENTER".
Press "ESC" to close.