195 km
120 km/h design speed
26 railway bridges
1 viaduct, 4 tunnels, 8 galleries, 10 stations
9 road overpasses, 5 road underpasses
14 animal crossings, 22 level crossings, 1 pedestrian overpass
The Nakhchivan Railway is a strategically important railway line that covers the district centers of the Nakhchivan Autonomous Republic and the city of Nakhchivan, serving both passenger and freight transportation. The project covers the reconstruction of this line.
The Nakhchivan Railway has been designed as a single-track line approximately 195 km long. Starting from the Zangezur corridor and continuing to the Turkish and Armenian border, the line connects Türkiye directly to Nakhchivan via the Dilucu Border Gate, and from there to mainland Azerbaijan, establishing an uninterrupted railway connection. With a design speed of 120 km/h, the line consists of 26 railway bridges, 1 viaduct, 4 tunnels, 8 galleries and 10 stations, as well as 9 road overpasses, 5 road underpasses, 14 animal crossings, 22 level crossings and 1 pedestrian overpass.
With the reconstruction of the Nakhchivan Railway, the aim is to renew the existing obsolete line in accordance with modern standards and to connect Nakhchivan without interruption to mainland Azerbaijan via the Zangezur corridor, and to the international railway network via Türkiye. Thus, an important component of the East-West transit trade route will be created; cargo originating from Central Asia, the Caucasus and Azerbaijan will be transported faster, more safely and more efficiently, and an alternative and complementary route to existing corridors will be provided through the Baku–Nakhchivan–Kars connection.
The project will also contribute to the economic development of Nakhchivan, the transportation of energy resources and products, safe and comfortable passenger transportation, and the development of the tourism, trade and service sectors, and will strengthen Azerbaijan's role as a strategic logistics hub on the North-South and East-West corridors.
The Nakhchivan Railway is a strategically important railway line that covers the district centers of the Nakhchivan Autonomous Republic and the city of Nakhchivan, serving both passenger and freight transportation. The project covers the reconstruction of this line.
The Nakhchivan Railway has been designed as a single-track line approximately 195 km long. Starting from the Zangezur corridor and continuing to the Turkish and Armenian border, the line connects Türkiye directly to Nakhchivan via the Dilucu Border Gate, and from there to mainland Azerbaijan, establishing an uninterrupted railway connection. With a design speed of 120 km/h, the line consists of 26 railway bridges, 1 viaduct, 4 tunnels, 8 galleries and 10 stations, as well as 9 road overpasses, 5 road underpasses, 14 animal crossings, 22 level crossings and 1 pedestrian overpass.
With the reconstruction of the Nakhchivan Railway, the aim is to renew the existing obsolete line in accordance with modern standards and to connect Nakhchivan without interruption to mainland Azerbaijan via the Zangezur corridor, and to the international railway network via Türkiye. Thus, an important component of the East-West transit trade route will be created; cargo originating from Central Asia, the Caucasus and Azerbaijan will be transported faster, more safely and more efficiently, and an alternative and complementary route to existing corridors will be provided through the Baku–Nakhchivan–Kars connection.
The project will also contribute to the economic development of Nakhchivan, the transportation of energy resources and products, safe and comfortable passenger transportation, and the development of the tourism, trade and service sectors, and will strengthen Azerbaijan's role as a strategic logistics hub on the North-South and East-West corridors.