Antalya-Alanya Section is a 2x3 toll motorway project. Total length is 155.7 km and the design speed is 120 km/h. There are 17 grade separated intersections, 4 at grade intersections, 10 tunnels, 25 viaducts, 44 bridges, 101 over-underpasses within the scope of the project.
This project will serve as an alternative to the state road and advance the quality of travel standard between Antalya and Alanya, one of the most important tourism route of Türkiye.
Antalya-Alanya Section is a 2x3 toll motorway project. Total length is 155.7 km and the design speed is 120 km/h. There are 17 grade separated intersections, 4 at grade intersections, 10 tunnels, 25 viaducts, 44 bridges, 101 over-underpasses within the scope of the project.