2013-2020, GEBZE, YALOVA, BURSA, BALIKESIR, IZMIR, TURKIYE

Istanbul-Izmir Motorway

It is the first motorway project that was tendered in Turkey with a Build-Operate-Transfer model. It’s total length is 426 km, consisting of 384 km of motorway and 42 km of connection roads.

The Istanbul–Izmir Motorway: A motorway that reduces the 8.5 hour journey to 3.5 hours

Overview
Project Summary

426 km motorway project

103 bridges, 38 viaduct, 3 tunnels

Osmangazi Bridge with 1550 m middle span 

Services
Location
Gebze, Yalova, Bursa, Balıkesir, İzmir, Turkiye
Period
2013 - 2020
Employer/Client
General Directorate of Highways

Write down the word you are searching for and press "ENTER".
Press "ESC" to close.